In the steel, chemical, electronics and industrial gas supply sectors, cryogenic air separation has become the mainstream technology for producing high-purity oxygen, nitrogen and argon. Based on its long-term involvement in the design, installation and commissioning of cryogenic air separation units, Shenger Gas has found that many operational issues do not originate from the process itself, but from what happens before startup. If the preparation work prior to starting a cryogenic air separation unit is not carried out thoroughly-especially in areas such as equipment inspection, system purging and pressure testing, pre-cooling, parameter setting and safety protection-these deficiencies can easily be amplified under cryogenic conditions into faults or even accidents. Drawing on practical engineering experience, the following sections systematically sort out the key steps to be taken before starting a cryogenic air separation unit, helping on-site teams establish a preparation workflow that is both actionable and reviewable.

Equipment Inspection and Maintenance: Identifying Hidden Problems at Ambient Conditions
Pre-startup equipment inspection is not a mere formality, but a systematic "health check" of the entire unit. A cryogenic air separation plant typically consists of an air compressor, pre-cooling system, molecular sieve purification system, heat exchangers, distillation columns, an expansion turbine, and a large number of pipelines and valves. Any defect in one of these sections may be magnified into a serious problem once the unit enters low-temperature operation. It is therefore recommended to inspect each system module step by step: for the compressor, focus on lubricant level and oil quality, and check for darkening, emulsification or water contamination; when necessary, perform oil analysis and replacement based on operating hours (for example, every 500 hours). At the same time, check shaft seals, cooling water circuits and couplings for leakage or abnormal vibration. For heat exchangers, columns and their associated pipelines and valves, pay particular attention to welds and flanges for traces of leakage, verify that cold insulation is intact without damage, and ensure that safety valves, check valves and other protective components operate freely. Operating experience shows that a significant portion of start-up and shutdown faults in cryogenic air separation units can be traced back to inadequate early maintenance or the long-term accumulation of minor defects. Eliminating these problems while the plant is still at ambient temperature is the first line of defence in startup preparation.
System Purging and Pressure Testing: Ensuring a Clean, Dry and Leak-Free Interior
Once the main equipment has been confirmed to be in good condition, internal system purging and pressure testing become one of the core steps before starting a cryogenic air separation unit. If welding slag, dust, oil or moisture remain inside the plant, they can easily freeze under cryogenic conditions, block heat-exchanger passages, or cause excessive local temperature gradients and concentrated thermal stresses. For this reason, dry nitrogen is usually used to purge the air separation system in sections and circuits, with the purge direction kept consistent with the actual future process flow and particular attention paid to dead zones such as instrument impulse lines and small-bore piping. After purging is completed, strength and tightness tests are carried out in accordance with the design requirements. The test pressure is generally set at about 1.1 times the design pressure, and possible leakage points are identified by monitoring pressure changes and conducting on-site inspections during the holding period. Field experience indicates that the more carefully purging and pressure testing are performed, the lower the probability of startup failures and unplanned shutdowns caused by pipeline contamination or leakage. Although this step may seem time-consuming, it is of high value for the long-term stable operation of a cryogenic air separation unit.
Commissioning and Parameter Setting: Finding the Optimal Operating Point Within the Process Window
As a cryogenic air separation unit gradually approaches its design operating conditions, the main focus of pre-startup work shifts from "mechanical readiness" to "process optimization." At this stage, it is essential to fine-tune key parameters such as the air feed rate to the columns, distillation column operating pressures, top and bottom temperatures, reflux ratios and product withdrawal rates, so that the unit can enter a stable cryogenic separation state as quickly as possible. Taking gaseous oxygen as an example, many projects control product purity at no less than 99.5% (by volume), while also balancing specific energy consumption per unit of product and downstream gas supply requirements. By making incremental adjustments to air distribution, reboiler duty and condenser duty, it is often possible to reduce overall energy consumption by a further 15–20% while still meeting the specified purity and production targets for oxygen, nitrogen and argon. During commissioning, it is advisable to keep detailed operating records, including temperature, pressure, flow rate, product purity and energy consumption. These data sets provide a solid basis for future restarts and troubleshooting, and make it easier to compare "design conditions" with "actual operating conditions," thereby continuously refining the operating strategy of the cryogenic air separation unit.
Safety Measures and Emergency Planning: Thinking Through the "What-If" Scenarios in Advance
Cryogenic air separation systems involve both high-pressure gases and operating conditions where oxygen enrichment and large releases of inert gases are possible, so safety measures and emergency plans must be revalidated before startup. Prior to putting the unit into service, online monitoring devices such as oxygen analyzers and combustible gas detectors should be checked to confirm that calibration has been completed, and the actions of safety valves, emergency shutdown valves and vent systems should be verified as reliable. Areas with elevated oxygen concentration and locations where nitrogen may accumulate must be clearly marked with warning signs. Operating personnel should be familiar with response procedures for scenarios such as power failure, sudden leakage or failure of critical valves, and regular drills should ensure that the emergency plan is not just "a document on the wall," but something that can truly be implemented under real incident conditions. At the same time, the alarm, interlock and emergency shutdown logic in the control system must be checked against field configuration, and the control room's 24-hour monitoring screens and historical trend recording functions should be confirmed to be working properly. This enables real-time tracking and assessment of the operating status of the cryogenic air separation unit during startup and load ramp-up.
Overall, the preparation work carried out before starting a cryogenic air separation unit is a systematic engineering task. From equipment inspection and system purging, through cooling and pre-cooling, to process parameter setting and safety planning, each step lays the foundation for long-term stable operation. If these measures are implemented thoroughly while the plant is still at ambient temperature, the likelihood of sudden failures under cryogenic conditions can be significantly reduced, and both specific energy consumption and maintenance costs are more likely to remain within the expected range. In its project practice, Shenger Gas consistently emphasizes the principle of "treat every startup seriously," regarding pre-startup preparation as a comprehensive health check covering design, construction, operation and maintenance, and safety management. Only by starting a cryogenic air separation unit on the basis of solid preparation can an operator secure a safe, stable, economical and sustainable industrial gas supply and fully realize the long-term value of the cryogenic air separation system.